To Do
Basement
- Clean carpets
 - Clean bathroom (partly done, Sun)
 - Patch popcorn ceiling in bathroom (done, Sun)
 - Paint bathroom
 - Finish painting up stairway
 - Install 4 lights
 - Put up blank wall plate on kitchen ceiling
 - Hang bathroom door & closet doors
 
- Finish putting cork on cabinet shelves
 - Finish painting cabinet doors
 - Polyurethane and attach kitchen kick-plates
 - Order satin nickel kick-plate for front door
 - Install toilet-tissue holder & towel holder in powder room
 - Have mirror cut for powder room
 - Install telephone jack
 - Change window latches
 - Rewire dining room chandelier
 
2nd Floor
- Change outlets & switches in master bathroom (done, Sun)
 - Remove caulk from bathtub seam
 - Finish white grout behind toilet
 - Paint un-tiled walls
 - Tile inside of soffit
 - Paint master bathroom door
 - Change door-knobs & hinges in master bedroom
 - Change closet door track
 - Basically everything in the rear bathroom
 - Etc.
 - Etc.
 - Etc.
 
Attic
- Lay down new insulation
 - Lay down floor
 
I was pretty depressed and overwhelmed most of Saturday, knowing that all these tasks loomed and I was going to have Dad for only one more week. But writing the list out was cathartic and I feel slightly more cheerful. It also helped that my mother promised to visit with Dad sometime in August :)
For some perspective on why I was feeling glum, however, let me illustrate:
The view from my bed.
The great wall of tools, now in my bedroom.
My toilet, a PVC latrine.
No comments:
Post a Comment